Mezzanine over Paint Booth

Mezzanine over Paint Booth

Constraint:

Most of the industries have powder coating unit or paint booth, which takes a lot of space on the floor. It requires a long significant space for each step. It can be a pre-treatment area space taken by furnace for curing or the unloading area along with other components.

Solution :

Various components of the Paint Booth could be kept on Mezzanine, and with its modular structure, Mezzanine becomes an integral part of the setup. In case, you need to change location, it can be easily done. Mezzanine provided was of the size 10m x 10m x 5m, with 250Kg per sq.m UDL.